GDE Assessment and Site Characterisation – Arrow Surat Basin Project

GDE Assessment and Site Characterisation – Arrow Surat Basin Project

2017

A GDE characterisation study including field investigation, isotopic sampling, and plant stress measurements to characterise the extent of GDEs in Arrow Energy’s Surat Basin tenements. The assessment utilised multiple lines of evidence including groundwater, soil and xylem isotope signatures, leaf and soil moisture potential to make a definitive statement on the groundwater dependence of vegetation at targeted assessment localities. The project outcomes were published in the Hydrogeology Journal in 2020 (see publications).

Recent Projects
Torres Strait Regional Authority Vegetation Mapping and Biodiversity Management Project

3D Environmental produced vegetation and regional ecosystem mapping for the…

View Project
Landform Assessment – Agnes Water

3D Environmental completed a geology and landform assessment over a…

View Project
Torres Strait Island Fire Management Project

3D Environmental completed ecological fire management profiles for 14 inhabited…

View Project